Showing posts with label renovation. Show all posts
Showing posts with label renovation. Show all posts

Friday, October 16, 2009

More Paint Choices

Before we moved in, Shawn and I managed to paint the living room, the office/guest room, the master bedroom (including the "dressing area"), the stairwell, and both the upstairs and downstairs hallways. Oh yeah, and all the trim and all of the doors upstairs.

We do eventually want to paint both bathrooms, and I'd like to paint the downstairs family room. But the next room on our list is the 4th bedroom...the one downstairs. AKA, the Man Room. Or the Preparation Room. Whatever you want to call it. Basically, since I've known Shawn, he's let me know that he would eventually love to have a room where he can keep all of his outdoor gear...camping gear, hiking gear, rock climbing gear, outdoor clothing, trail maps, technique books, etc... He loves the idea of having everything well organized and easily accessible in one room. When he's ready to go out and do something, he can use this room to prepare for it (hence the "preparation room" name).

So when we bought this house and it had that fourth bedroom downstairs, I figured it would be the perfect opportunity for Shawn to have his preparation room. (By the way, I just call it the Man Room because I think it's funnier.) Let's be honest...I love the idea of all of his "stuff" being out of the way of everything else. I also like the idea of keeping all of that dirty equipment downstairs and away from the main living area. That downstairs bedroom gets bonus points for being right next to the garage.

Before the move, we just ran out of time for painting the Man Room. At the moment, all of Shawn's outdoor gear is in the garage. (It's okay...we can't park our car in there right now anyways since the door is broken and needs to be replaced. Had I mentioned that little detail yet?) We want to paint the room before we bring in all of the gear and the tall shelves that will house it.

I told Shawn that picking out a paint color for this room is his job. I'll gladly give input if he wants it, but ultimately, the choice is his. He started out with these nine colors as possibilities.

After he and I discussed the options, he went to get samples of some colors. He had narrowed it down to four. These are our choices.

#1 is Aspen Gray, #2 is Stone Mason Gray, #3 is Porcelain Shale, and #4 is Mountain Smoke. (Do you see any trends in the names of these paint colors?) Once these dry and Shawn picks a color, we'll paint the room! I'm hoping to get it done this week. But let's be realistic...I'll be happy if it's done before Shawn's family arrives for Thanksgiving. :-)

Thursday, October 1, 2009

Three More Days!

How on earth is it already October 1st?? We've had so much going on in the month of September, no wonder it went by so quickly. On September 1st, we were relaxing in Maui (ahhhhh.....). If I remember correctly, September 1st was our first full day there, so we just hung out on the beach all day. :-) While we were in Maui, I had a few students in my online classes, but the week we got back to the mainland, my job really took off with the addition of 17 students in one day! That was the same day we signed all of our paperwork for buying the house, which we finally took possession of two weeks later (on September 22nd). The day we closed on the house was the same day that I was given two new sections to teach...which added 83 new students to my roster in one day! So for the last week, I've been really busy with the online teaching and also getting over to the house to do work in there. All this time, Shawn's been really busy at work, putting in extra hours and often working past midnight at home.

So...it's October 1st. Absolutely nothing is slowing down for us right now...we're moving on Sunday! Fortunately, I got all caught up last night with my teaching (as of 11:00pm, I officially had no assignments left to grade, no messages to respond to, and no discussion board posts to read). I have a couple meetings today, but I'm hoping to spend most of today doing things to get ready for the move. Here's what we're hoping to get done in the next three days!

  • PACK!! As of right now, I've packed a whopping 5 boxes. Yep. That's it.
  • Paint: We still need to paint the stairwell and downstairs hallway, the downstairs bedroom, all of the trim, and the bedroom doors.
  • Clean carpets: A friend and coworker of Shawn's is lending us his heavy-duty carpet cleaner. Eventually we would like to replace the carpet, but we just don't have the time or money for that right now, so a deep clean will have to do.
  • Put outlet and switch covers back on.
  • Purchase and install shower curtain rods.
  • Purchase and put down shelf paper in the bathrooms. Whatever used to be lining the vanity cabinets and drawers is no long there...and there's a disgusting residue left over that I can't scrub off.
  • Power wash and stain deck. Something tells me the deck's not getting done this weekend, but I'm putting it on the list anyway.

There's definitely more to be done, but I think everything else can pretty easily wait until after the move. In fact, I think some things (like installing the entryway chandelier) will be easier after we've moved in. I did feel bad that Shawn had to spend a beautiful Sunday a couple weeks ago working, but that does mean that he can take off Friday without using a vacation day. So what do you think....do we have any chance of getting all this done before we pick up the moving truck at 9am on Sunday? :-)

Tuesday, September 29, 2009

Painting the Master

After painting the guest room/office, we decided to start in on the Master bedroom. The Master is at the front of the house, so it gets good light in the morning. The walls in here were actually two different colors, although the blue was so pale that it didn't look much different than the white(ish) color that the other walls were painted. (Side note...in the closet, we could see other colors that had been painted in the Master at some point. Prior to the pale blue, this room was a light green. Before that...HOT pink.)

Before painting:

The Master doesn't technically have its own bathroom. However, it does have a "dressing area." It's this little vanity and another closet, and this area connects to the main bathroom on the floor. (Note: we discovered on Sunday that the door from the Master to the bathroom doesn't really close entirely. It'll pop open at any given moment. Something else to be fixed.)
For most of the Master bedroom, I used the roller while Shawn did the detail work at the ceiling, floor, corners, and trim.
This little vanity area was kind of a pain to paint...trying to get around those mirrors and lights.
This is the first coat in the Master bedroom. It will definitely need a second coat because there are too many areas where the light color underneath is showing through. This paint is a bit different than we were expecting. In this picture, it looks fairly light. In person (and in certain light), it actually looks quite bold. At twilight on Sunday, this paint looked downright purple!
My hunch is that it'll look better after a second coat, and I think that it'll be toned down a bit when we put our furniture in here. We have a dark wood dresser, and our bedding is black with a white geometric pattern. And worst case scenario? We'll live with it for awhile and eventually paint it again.





Monday, September 28, 2009

Starting the Makeover!

After getting our keys to the new house last Tuesday, Shawn and I have been trying to juggle our jobs and doing what needs to be done in the house. We've known all along that we'd like to do quite a bit of painting in the house, and it just made sense to us that we should attempt to do as much of it as possible before we actually move in. Empty rooms = easier painting!

Since neither of us has done much painting in awhile, we decided that the first room we painted should be one that wouldn't be a big deal if we messed it up a bit. So...exhibit A. This is the bedroom that I'm guessing used to be a nursery for twins. We've decided to make it our office/guest room. A few days ago, it was a bright, cheery yellow.

With vinyl words attached to the wall. I'm guessing they were over cribs...they just seem to be that height. The other set said, "I'm a princess with an attitude!" Cutesy, no? But not really what we had in mind for our office. I figured I could peel them off...they're basically stickers. I thought my fingernails would do the trick, and a putty knife would be a good backup (with spackle, if necessary).

Fortunately, a friend on facebook had a brilliant suggestion. A hairdryer!! After about 60 seconds of hot air blasting onto the letters...

...the letters basically peeled right off! The backs of the letter actually remained rather sticky, so I'm thinking if I'd really wanted to salvage them, I probably could've. I didn't. :)

Once the words were off the walls, I started washing down the walls with TSP. Shawn taped around all the trim, and then we dove in to the painting. I have to admit that it was a little nerve wracking to put the roller to the wall the first time.

We switched off some for this room, but I think Shawn was pretty handy with the paintbrush, taking care of the trim. We got the first coat done on this room on Saturday night, and we did a second coat on Sunday. (We'll admit that we're a bit annoyed by the fact that we needed two coats, considering that we bought the expensive paint based on the recommendation of the paint guy at Lowe's who told us that it would eliminate the need for primer and also would most likely cover just fine in one coat.)
Oh, just to clarify...before we did the second coat, Shawn's friend David showed us how to get the blinds off the window, so yes...those did come down. :) We haven't painted the trim yet (that'll probably be Tuesday evening), so I'll post official "after" pics of the room when that's done.